• Rubber Sheet Batch off Cooler with Auto Flod Rubber Sheet Equipment
  • Rubber Sheet Batch off Cooler with Auto Flod Rubber Sheet Equipment
  • Rubber Sheet Batch off Cooler with Auto Flod Rubber Sheet Equipment
  • Rubber Sheet Batch off Cooler with Auto Flod Rubber Sheet Equipment
  • Rubber Sheet Batch off Cooler with Auto Flod Rubber Sheet Equipment
  • Rubber Sheet Batch off Cooler with Auto Flod Rubber Sheet Equipment

Rubber Sheet Batch off Cooler with Auto Flod Rubber Sheet Equipment

After-sales Service: After Services 24 Hours Online
Warranty: 24 Months
Certification: CE, ISO, TUV
Condition: New
Customized: Customized
Automatic Grade: Automatic
Gold Member Since 2021

Suppliers with verified business licenses

Manufacturer/Factory

Basic Info.

Model NO.
XPGL-1000
Structure
Horizontal
Application
Rubber Sheet Cooling
Transport Package
Standard Export Package
Trademark
JUNFAN
Origin
China
HS Code
84778000
Production Capacity
100sets/Year

Product Description

Rubber Sheet Batch Off Cooler with auto Flod Rubber Sheet Equipment
Overhead Type Rubber Sheet Cooling Machine
Rubber Sheet Batch off Cooler with Auto Flod Rubber Sheet Equipment
Multi-layer Type Rubber Sheet Cooling Machine
Rubber Sheet Batch off Cooler with Auto Flod Rubber Sheet EquipmentRubber Sheet Batch off Cooler with Auto Flod Rubber Sheet Equipment
Hang lever Type Rubber Sheet Cooling Machine
Rubber Sheet Batch off Cooler with Auto Flod Rubber Sheet Equipment

Rollers Cooling Type Rubber Sheet Cooling Machine
Rubber Sheet Batch off Cooler with Auto Flod Rubber Sheet Equipment
Annular CoolingType Rubber Sheet Cooling Machine
Rubber Sheet Batch off Cooler with Auto Flod Rubber Sheet Equipment
Auto Swing Device
Rubber Sheet Batch off Cooler with Auto Flod Rubber Sheet EquipmentRubber Sheet Batch off Cooler with Auto Flod Rubber Sheet Equipment
All our machines can be customized according to your requirements.

Application
Rubber batch-off machine is the downstream auxiliary to the mixer or the dispersion mixer. It is used for cooling, folding and depositing the rubber strip that comes from the open mills or twin screw extruder. It is designed to perform continuous operations of rubber slab conveying, separate applying, air cooling, drying, cutting and wig-wag stacking.

>> Features
1. There are two structures types: Overhead and floor-standing types.
2. The clients can choose high or low disposition according to the practical requirements.
3. The high disposition batch-off line has hydraulic auto wig wag section, which can battle the rubber strip tidily, the strip tidy ratio (< =100mm);
4. There are three working positions for auto entering and outputting of material tray.
5. Auto rubber collecting device; Auto cutter device; It has high automatization and can realize unattended operation.


>>MAIN TECHNICAL SPECIFICATION
Model XPG-600 XPG-800 XPG-900
Max. rubber sheet width 600mm 800mm 900mm
The thickness of the rubber sheet 4~10mm 4~10mm 6~12mm
Linear speed of taking-in conveyor 3~24m/min 3~35m/min 4~40m/min
Linear speed of sheet hanging bar 1-1.3m/min 1-1.3m/min 1-1.3m/min
Hanging height of the sheet hanging bar 1000-1500m 1000-1500m 1000-1500m
Number of cooling fans 12 20~32 32~34
Power 16KW 25~34KW 250KW
Overall Dimension(mm) 14250X3300X3405 16800X3400X3520 6000X2850X4450 

>>Description of spare part
 
1. Take in device:
Used to take pressure in film, according to cylinder controlled by fluctuation, operation convenience. Taking in speed can be controlled by manual, it can be ascension. Take device adopts conveyor, the transmission system adopts frequency governor to control.
2. Soak device:
Equipped with triplet, manual rotary valve and pressure cylinder, adjust pressed roll according to cylinder control through the manual rotary valve, in order to Make discontinuous film compressed together and the film continuous a slice.
3. Leaching plasma device:
Function: Take over the film conveying equipment undertakes immersing, and carry on isolation agent. Equipped with cooling water pipe, through the cooling water source, continuous cooling liquid isolation, in order to control the temperature.
4. Take up device:
This device through the conveyor belt with isolation liquid film will be conveyed to the air cooling section gripping.
5. Wind cooling device:
Constitute: It is made of frame, cooling fans, hook rail and hang lever conveyor. Cooling fan selection adopts 20 axial fan, satisfy the requirements of film cooling; Hang lever are installed on the taper pin, film in hang lever.
6. Conveying laminated device:
Will the film into laminated measures, continuous fold in film seat.
7. Air control part:
Take-in control, each cylinder pressure and in the action, control system adopts reliable performance with high quality products.
8. Electrical control system:
(1) All the wires controlled by PLC, it easy for operation, reliable quality.
(2) The speed of production line can be through the inverter adjustment, make the film cooling line speed and host match.
(3) Fan control by the group control each motor are over-current protection circuit breaker, when a fault fan produced when the output signal of the fan, fault in all units and stop hair drier, just deal with a fault can be fan.


>> Company Information
Rubber Sheet Batch off Cooler with Auto Flod Rubber Sheet Equipment
1. 40 years on rubber machinery manufacturing and exporting.
2. Delivery within 30 days.
3. Safety wood or plywood crates packaging.
4. Full transportation insurance.
5. Sell to 126 countries on 6 continents.


>> Delivery Demonstration
Rubber Sheet Batch off Cooler with Auto Flod Rubber Sheet Equipment

>> Some Exhibition Pictures
Rubber Sheet Batch off Cooler with Auto Flod Rubber Sheet Equipment
COMPANY CERTIFICATE
Rubber Sheet Batch off Cooler with Auto Flod Rubber Sheet Equipment
>>FAQ
1. Delivery time of the rubber machines?
This is specially designed machine according to your specific requirement.
From engineer designing to production completion, it needs about 25 to 35 days.
2. What does your factory do regarding quality control?
We pay much more importance to quality control from the very beginning to the end of production.
Every machine will be fully assembled and carefully tested before shipment.
3. What's the machine quality guarantee?
Quality guarantee time is one year.We choose world famous brand components to keep our machine in perfect working condition.
4. Are you able to give installation and commissioning overseas? How long time will it take?
Yes, we can supply overseas service and technical support but customer needs to pay for the cost of the installation.
Small machine usually takes within 2~3 days.
Big plant usually takes about 30 days.
5.How can I trust you to deliver the right machine as I ordered?
We will absolutely deliver a good quality machine as we discussed and confirmed in the order.
The core of our company culture is innovation,quality,integrity and efficiency. Also we have had many good cooperation with world famous rubber production manufacturers. If you come to our factory, we can show you're the user around us.
6.How can we go to your side?
We are located in Qingdao City, Shandong province, China. The name of airport is Qingdao Jiaodong International Airport.
We will pick up you at the airport.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now